cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
629
Views
2
Helpful
2
Replies

IE-1000-8P2S-LM has a long lead time.

biju kumar
Level 1
Level 1

IE-1000-8P2S-LM has a long lead time. Which switch model would be the equivalent? The physical dimension is also a big factor. 

2 Replies 2

marce1000
Hall of Fame
Hall of Fame

 

 - FYI : https://www.cisco.com/site/us/en/products/networking/industrial-switches/index.html

 M.



-- Each morning when I wake up and look into the mirror I always say ' Why am I so brilliant ? '
    When the mirror will then always repond to me with ' The only thing that exceeds your brilliance is your beauty! '

I am choosing IE-2000-8TC-G-E switch. It is a hardened switch that can support 8 poe cameras.