cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Who Me Too'd this topic

Tidal Mass Updates

bruced63
Level 1
Level 1

I have a situation where there are 300+ Tidal jobs defined to run on a particular agent/adapter.  I need to move 200 of them to a different agent/adapter.  Is there an easy way to do this without having to open each job up one at a time?

 

Thanks in advance.

Who Me Too'd this topic