03-10-2017 11:07 AM - edited 03-05-2019 08:10 AM
Hi Team,
I have a Cisco Switch 3750 in production but i need to add a second switch as stuck switch can I do it while is in production or Do I need to shut down the switch.
Also do i need to do any configuration after been install thank you team.
03-10-2017 12:03 PM
Hi,
Follow this link to add the new switch.
http://www.cisco.com/c/en/us/support/docs/switches/catalyst-3750-series-switches/71925-cat3750-create-switch-stks.html#anc16
HTH
03-10-2017 01:18 PM
Could you expand on "stuck switch"?
03-10-2017 11:07 PM
i need to add a second switch as stuck switch can I do it while is in production or Do I need to shut down the switch.
The new member switch must be powered off BEFORE attaching any stacking cables. Failure to do so will force the existing stack to reboot (this is by design).
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide