Hi there,
I have an existing stack of 4 C3750's which are using the rear stacking cables. I'm looking to add one more C3750 with the same cable. Does the whole stack need to get powered down before I add this additional switch to the stack? Or can I hotplug the additional switch into the stack?
Anything I should be aware of when adding this switch into the mix other than Bridge ID/Priority issues?
Thanks,
Julian