I am trying to design a Unity 4.0(3)System.
It will be integrated with CCM and Exchange 2000/2003 servers.
1) Is there a way to have 2 Unity servers and have
it set up for load balancing?
2) Is having two Unity servers pointed to two Call
Managers and setup to failover a single secondary
Unity server feasible?
3) Or if there is any other way/design to achieve a
redundant Unity Server system please advise .
Thanks.