Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Good day, I have the following topology (Stack switches are Catalyst 9k): Core A (g0/0)--(g0/0) Stack 1 ..... stack 8 (g0/1) -- (g0/1) Core B At the moment of configuring the stack using the command sw# switch <number> priority <priority> Which is t...
Hi, Recently I created a script using the variable $tcl_platform(user) which gave me the user used to log into the switch. I wanted to know if there are more variable like this or any material with TCL variables commonly used with information of rout...
Hi everyone, When I'm deploying an image using Cisco prime for stacked switches, should I follow the same process followed for only one switch (select the image/select the device IP) or I do have to consider something in particular (for example in th...
Good day, Do you think it may be related to the STP logic? @Joseph W. Doherty wrote:"Regarding to @Joseph W. Doherty reply, it's ok to say that the uplink switches shouldn't be master or standby? Regarding to the 9k series switch stacks."I would say ...
Good day, Thank you very much guys @Seb Rupik @Leo Laohoo @Joseph W. Doherty @Reza Sharifi for the valuable information. It will be of great help at the moment of designing my network. Have a nice day everyone and again, thank you very much.
Good day, Thank you very much @Leo Laohoo :). Regarding to @Joseph W. Doherty reply, it's ok to say that the uplink switches shouldn't be master or standby? Regarding to the 9k series switch stacks. Thanks in advanced.
Hi @Reza Sharifi , Thank you for answering. I configured the switches using a priority of 15 for the switch 1, 14 for the switch 2 and so on based on the following topology: Topology: Core A (g0/0)--(g0/0) Stack 1 ..... stack 8 (g0/1) -- (g0/1) Core ...