Can someone please explain reliability 255/255, txload 41/255, rxload 151/255.This is the serial interface on a Cisco 2600 router. Does this mean that rxload for example 151/255 is more then 50% saturated receiving from the carrier to the router? O...
I can not seem to get this right. Im trying to load a new PIX configuration file to the startup config of a PIX515E so when a reboot is done, it loads the new config. This is for a ISP change at a live site. I guess TFTP would work and i could ver...
Greetings,I have little prior experience dealing with stacking 3750s and was looking for a little help. We have 18 fiber pairs collapsed from the IDFs at the distribution layer and I'm looking for the most cost effective way to handle this. I figure...
I am looking for opinions on how to best setup a site to site VPN. Hardware? Configuration? PPTP or IPsec tunnel?? Currently, my main office has all our servers (Domain controller, Fileshare, Exchange server, DNS,Asterisk (VoIP) and all our network ...
Hello,I?m hoping someone may have the answer to this. I am trying to block ALL types of IGMP traffic on a particular interface on at 3560-24-TS-S. We have a Summit 5i switch acting as a core switch for 400 users which all (VLAN 3) participate in a m...
So I understand it will be easier to stack just the 2- 3750G-12S and run 2 fiber trunks between them and the core switch then configured using cross stack member channel? I have very large host bandwidth requirements. 700 devices with 10% running 2...
The new office will be a very dynamic lab area which needs to have different server types plugged into a DMZ. The 2600 is dated but on our shelves. Miss working for a big company with lots of money!!
Black = dirty netGreen = VOIPBlue = corp. networkAlthough everyone in the world seems to know what cables they are adding or removing with out authorization so my data center looks tough