Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
We are currently trying to deploy CyberVision to over 100 of our switches. It looks like the majority of the configuration can be pushed through a template in CC. The challenge is when we configure the addressing. Does anyone know if CC is capable...
I was wondering if someone could please explain to me the difference between a DR and HA configuration with catalyst center(CC) and if you can have both configured at the same time? We are currently running a DR configuration in our production envir...
I was wondering if it was possible to upgrade from a 2 port module to an 8 port module in the 9300-48H switches? We are using a full SDA deployment in our environment and I assume if we tried to swap them out we would run into a slew of issues in do...
I am wondering how these work as well. When I provision a device some templates are applied automatically while others require a tag to be applied. Can someone please explain this? Thanks.