Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
I currently have 2 3850 Switches on my network. Both have configuration, that is, interfaces, vlans, SVIs. My question is, when forming stackwise, is the configuration of both maintained? Or is only the master configuration maintained and the standby...
So to summarize the steps:1 - Turn on the switch that I want to become the master and keep the settings.2 - Turn on the Switch that I want to be "standby"3 - Plug in the stack cable.Is resetting both "reload" members necessary to form the stack?I'm a...
I have a 3850 that I would like to keep its settings, as it is my main switch, how do I ensure that when the stack is built, my main switch will become the master, and keep the configs?
Excellent! So a good alternative would be to make the factory default on the switch that will be the "standby", ok!Another question, to ensure that the master will maintain its settings, should I set it to Priority 15, and the standby set it to Prior...