Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi everyone, I have single 6506 chassis with two supervisor engineers (WS-X6K-SUP2-2GE ). Post power shutdown one of the engine is not appearing in inventory.Below is the console output CoreSwitch> (enable) session 15Module 15 is not installed.CoreS...
Hi, i run cisco analyzer tool on newly installed CME and found one danger with this error "Cisco IOS-XE System Diagnostics: Error: unable to verify the first certificate" Need your help to understand this error came and how can fix this error. Thank...
Hi Everyone,
After Ios upgrade from 03.03.03SE to 03.06.06E I found in web console stack Packet Error 90% (it varies)
after troubleshoot I found one port in master-switch giving problem g 1/0/5 if I disable, it will normal and if enable again then ...
Hello everyone,
I want to add one more ws-c3850-48t in already stacked switches of ws-c3850-48P.
just confirm now switch not POE so it will be stack or not. and current switch stack user interrupt?
Thanku.
Hello to All,I am facing issue in inter-vlan routing of three 3850 switches stack working as vtp serverfind below the run config. why i can not ping/communicate b/w vlan Building configuration...Current configuration : 19115 bytes!! Last configurati...
yes i can connect to session 16, on Sup2 . So now we will switchover from Sup Engine2 to active then we can restart Supervisor engine1Just to confirm does this requires any maintenance window or downtime?