Hello,
I have an AppNav cluster that contains 2 ASR routers and 3 WAAS: 2 physical WAAS with 6k license, 1 vWAAS with 50k license.
The load distribution does not seem to work: as the 6k get filled up, the 50k never gets to optimize more than 6000 s...