Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi All. Im trying to accomplish the following, appreciate if you could confirm my action.Scenario. Swicth A -> Switch B -> Switch C Vlans 10,20,30,40,50 are trunked from 'A' through 'B' to 'C' I need to remove and delete vlan 30 from Switch B.I inten...
Hi All, Hi All, Taking the cisco example below, which demos how to PBR. access-list 1 permit 209.165.200.225access-list 2 permit 209.165.200.226!interface ethernet 1 ip policy route-map Texas!route-map Texas permit 10 match ip address 1 set ip preced...
Hi All, Taking the cisco example below, which demos how to PBR. access-list 1 permit 209.165.200.225access-list 2 permit 209.165.200.226!interface ethernet 1 ip policy route-map Texas!route-map Texas permit 10 match ip address 1 set ip precedence pri...
Hi, are there any type of debug monitoring cli commands that should be used with caution and that could crash a switch (L3 switch)? Just out of interest. Thanks
Hi. I have a stack of 2 non Poe 3750x switches with a single 350watt psu in each with power stack cables connected. I have purchased an additional psu to slot into switch1. I need to take the existing psu offline for maintenance. Is it as simple as s...
Thanks.Once all 3 psu's are live after maintenance would you recommend power redundant mode so one psu will stay dormant until failure or default power sharing?