Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Hi All,I have client who has two distant offices with 3750 L3 as core (do all vlan routing for local office) and multiple L2 access switches with multiple VLAN’s connected to it. First 3750 is hub also connected to internet, second 3750 is spoke and ...
Hi,I have two offices in rural area with a quite distance between them. Offices are connected with private wireless 100Mbps and cooper 100Mbps links provided by different ISP. Wireless connections are delivered as a private L3 Ethernet link but coope...
I have 3750 core/distribution switches with routing enabled in two offices connected with copper link and L3 port channel interfaces. NewOffice#2 has moved about 5 miles farther away from office#1 and I have to deploy new core/distribution switch con...
Hi AllI got task to design enterprise wide wireless solution for my client. There are 50+ offices from 20-600 users. Offices are mostly connected as a hub and spoke by MPLS or VPN IPsec. Most of the office will have one or more WLC but some will have...
Hi ALL,I'm going to design deploy and manage WAN – OSPF (mostly edge routers) for big company with offices all over America (around 50). LAN is managed by local stuff. How I can protect WAN - OSPF routing table from learning wrong route entered on LA...
I have multiple sites with router runing OSPF in failover configuration running HSRP IP allocate for loopback interfaces for this site are 10.255.240.0/24. Is below IP assignment correct?Active router Interface loopback0IP address 10.255.240.200 255...
Open space beetwin office is not covered Roaming: in addition to roam between APs(L2) users will roam between WACs (L3) Also traveling user should be able to connect to network no matter what office they are in Thanks
Forgot to mention that I would like to control which router is going to be DR and BDR (Router with highest loopback address (RID) will be assigned highest priority and elected as a DR and first lower as BDR). Having that already assigned range may no...