Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Gi1/1/1 Root FWD 20000 128.49 P2pPo1 Desg FWD 2000 128.2281 P2pboth are connected to the root bridge, which is a pair of 9500's. with each port connected to a different switch. G1/1/1 goes to core 1, with g1/1/2 going to core 2. trying...
can I stack a C9200-48P with a C9200L-48P-4X It isn't an option when i go to provision the second switch... not matter which one I make switch 1. I am guessing these cannot be stacked.
I am trying to configure the internal AP to join a wireless controller. It is in CAPWAP mode but I keep getting the following log Jan 10 15:59:42 kernel: [*01/10/2020 15:59:42.2299] Waiting for preferred uplink IP configuration How is it supposed to ...
You have nailed the scenario. How is this even possible?ILLINI-DC-CORE#show spanning-tree vlan 6VLAN0006Spanning tree enabled protocol rstpRoot ID Priority 4102Address 3473.2dd9.db20This bridge is the rootHello Time 2 sec Max Age 20 sec Forward Delay...
if it connect to Core2 and Core1/2 run StackWise virtual (one virtual SW) and PO and G1/1/1 is FWD State, we have problemNow I think you understand my question. 1 switch plugged into one virtual switch.
This really is very simple. 1 9200 connected to a 9500 stack. We connect g1/1/1 to core1 and 2/1/1 to core2. Used to be called a vss pair, and is now stackwise, maybe? But the 9500 pair is the spanning tree root. so virtually one switch plugged into ...