10-05-2021 08:37 AM
10-06-2021 10:14 AM
Did you enable PIMv6 under the BD?
Did you enable Multicast on the VRF?
Robert
10-06-2021 10:39 AM
Thnx for your reply,
No, we didn't enabe PIMv6 under BD and multicast under VRF. Because i think vxrail node just need L2 multicast from ACI.
Correct me if i'm wrong.
05-11-2022 02:41 PM
Hello,
How did you go about solving the problem?
Thank You!
05-24-2022 09:28 AM
Ran into this recently.
During the VxRail build (initial or node addition) there is a lot of IPv6 multicast communication within the VLAN 3939 ("VxRail Management"). I found that disabling Rogue Endpoint Control in ACI allowed this process to finish. Once the VxRail is done being built (or additional node added) you can safely re-enable Rogue EP control.
You do not need to do anything with MLD or PIM policies on this EPG/VLAN. This is because this network never leaves VLAN3939 and you do not have a gateway/subnet configured in the associated "VxRail Management" Bridge Domain.
07-08-2022 07:48 AM
Hello Brandon,
Thank you so much for compatilhar, I've already booked here in the knowledge base.
Thank you very much!
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide