This document was generated from CDN thread
Created by: ANGELA MILLER on 09-03-2009 07:33:30 PM
Hello,
How does this node interact with ICM? I see that it allows for setting of PV 1-10 and the FromEXt VXMLs. Is there an equivalent on the ICM side that sends this exact data from ICM to Studio? I know that we have the ToExtVXMLs at our disposal but none of which allowed for Peripheral Variable Transfer. Does the ReqICMLabel allow for constant communication back and forth with ICM - so for example can I use more than one in a single studio application? I am not sure if I would want to - I am just trying to determine the advantage to this node. Thanks. Angie Miller
Subject: RE: CVP Studio - ReqICMLabel
Replied by: Janine Graves on 12-03-2009 11:00:15 PM
The ReqIcmLabel can NOT be used to interface to ICM if ICM routes the call into Studio. It's meant for calls that come into Studio apps directly. When that studio app needs to route the call, it can request a route from ICM. ICM runs a routing script based on the DNIS of the original call and returns a route (phone number or something). The Studio app can then transfer the call out to that phone number.
ICM can put data into the PVs and they will go into the Studio as element data for that ReqIcmLabel named callvarReturn1, thru callvarReturnN. ICM can put data into ToExtVxml array as namei=valuei pairs. This will create session data with named namei with the associated value. ICM can also return a label, this goes into element data named 'result' for the ReqIcmLabel.
I haven't had a chance to try it.
Subject: RE: CVP Studio - ReqICMLabel
Replied by: SEAN NILSEN on 19-03-2009 05:26:02 PM
I think the real question that should be asked is:
When do we get the feature of passing PV1 - PV10 as opposed to having to parameterize in the ToVXML Arrays?
I also generally hit a character limit on those arrays, depending on what other ECC Variable size's I've got in a particular environment.
My complaint is that IPIVR has this capability today using the GET/SET ICM Data objects, which is stellar btw.
What I find incredibly frustrating is that if you go run a VRUTRACE for your VRU PIM, ICM *is* sending the data in the SCM messaging but CVP is dropping it on the floor apparently.