cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
339
Views
2
Helpful
2
Replies

Adding multiple nodes to deployment at same time?

 

Am I able to add multiple ISE nodes to a deployment at the same time whilst another node is already "in progess" and joining or should I wait until that is completed before adding another?

 

 

2 Replies 2

@NetworkMonkey101 I know of no reason why there would be a problem joing multiple at the sametime, beside that, it doesn't take that long to join the nodes anyway.

Yes you can do that without any problem. In that case synchronization will be happening to the multiple nodes at the same time.