Using ISE 1.4.0.253 (patch 6) and created an End Point Purge condition
"Data_MAB_group AND ENDPOINTPURGE ElapsedDays GREATERTHAN 1" to purge all end points in the Parent Group called Data_MAB_group. But the end points are never purged. The GUI allows this configuration but is it an allowed feature?
I have had an existing working condition of "GuestEndpoints AND ElapsedDays Greater than 1" ... I can see that this works.
But when I cloned this condition I am always given ".. ENDPOINTPURGE ElapsedDays GREATERTHAN 1". The ENDPOINTPURGE is prefixed to the ElapsedDays. Is this the problem? The patch hostory is patch 3,4,6 (we skipped patch 5)