Hi ,

  I have a customer who wants to upgrade from WCS to PI12. Please let me know if the below is the correct procedure for it. Its a bit confusing due to the fact that first we need to migrate to NCS1.1 to reach PI12.

1. Order the WCS to PI12 upgrade SKU

2. Order the Prime APpliance with NCS1.1 software version (instead of PI12 software)

3. Get a demo license for NCS1.1 and migrate from WCS to NCS1.1

4. Upgrade NCS1.1 to PI12 software

5. Add the WCS to PI12 upgrade license on PI12.

15 Replies 15

Cuong,

Rob Johnson noted the correct procedure above. My original post was based on some incorrect documentation.

The evaluation software is only limited in number of devices and time of the license. All other features are exactly the same as a fully licensed installation.