cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Who Me Too'd this topic

MST with a PVST+ CST ROOT

yuribank415
Level 1
Level 1

According to cisco you should be able to have a PVST+ switch act as the CIST ROOT if ALL vlans on the PVST+ switch have the lowest priority.

When I lab such a scenario I get PVST Simulation Inconsistent errors on my MST switches.

I also tried doing this with the common vlans between my PVST+ and MST switches, all assigned to the IST 0, but still with the same problems.

Could someone explain why this is happening, and if what I am trying to accomplish is even possible?

Who Me Too'd this topic