cancel
Showing results for 
Search instead for 
Did you mean: 
cancel

Who Me Too'd this topic

6880-X-LE / What is C6880-X-NEBS-PAK ? / Air Dam / NEBS compliant

jhutter
Level 1
Level 1

Hi,

We ordered a 6880 switch along with the C6880-X-NEBS-PAK (Mandatory Air Dam set for 6880-X to meet thermal requirement) option.  What is the difference in hardware if you do not choose this??  

The reason I am asking is during configuration we are getting this warning on boot up:

*Jun 24 16:15:57.395: %DIAG-6-DIAG_OK: Module 5: Passed Online Diagnostics
*Jun 24 16:15:57.979: %C6KENV-4-LOWER_SLOT_EMPTY: The lower adjacent slot of module 5 might be empty. Airdam must be installed in that slot to be NEBS compliant
*Jun 24 16:16:04.939: %OIR-6-SP_INSCARD: Card inserted in slot 5, interfaces are now online

 

So I am not sure what I would even be looking for?  Is it a change on the empty module slots?

 

Thanks for your help.

Who Me Too'd this topic