cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
416
Views
0
Helpful
2
Replies

In a data center shop i find the need of an additional as.

IF the switch front supervisor has a backplane it also has router.

 

it should be directed router bgp 1  even 0  a number available for that.

 

 

2 Replies 2

alblimubtel
Level 1
Level 1
  1. Assess the structural integrity of the existing roof to determine its capacity for additional load.
  2. Consult with a structural engineer to evaluate the feasibility of adding an additional AS (server) to the roof.
  3. Ensure compliance with local building codes and regulations regarding roof modifications.
  4. Consider the impact of the additional AS on the roof's insulation and ventilation systems.
  5. Plan for proper waterproofing and weatherproofing to protect the AS and prevent leaks.
  6. Install appropriate support structures or platforms to safely accommodate the new AS on the roof.
  7. Coordinate with HVAC specialists to manage heat dissipation from the AS units on the roof.
  8. Implement safety measures such as guardrails or barriers to prevent accidents for personnel accessing the roof.
  9. Document the installation process and update maintenance procedures to include the new AS on the roof.
  10. Train staff on safety protocols and maintenance procedures related to the new equipment on the roof.
  11. Monitor the performance of the roof and AS regularly to address any issues promptly.
  12. Consider long-term maintenance and replacement plans for the AS units on the roof to ensure continued functionality.
 
 
 
 

I mean autonomous system number in the circuit
i found that it could be off the mind couple and the entire facility could
be like as1 and the network would mind couple the the gateway which would
be your settled as #.

understanding this is in fact how it works it was all about a different
opinion on something.

surely the man absorbed that.