cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
200
Views
0
Helpful
0
Replies

SDWAN - High Availability of Controllers

jlaguerre
Level 1
Level 1

Hi good day I would like some assistance/advice on creating High Availability across SDWAN controllers on . 

The following is my interface configs:

DC1
vManage-1
vpn 0
int eth0 IP address 192.168.10.10/24
int eth2 IP address 10.10.10.10/24

vpn 512
int eth1 IP address 192.168.20.10/24 

DC2
vManage-2
vpn 0
int eth0 IP address 192.168.30.10/24
int eth2 IP address 10.10.20.10/24

vpn 512
int eth1 IP address 192.168.40.10/24 

All routing is in place and both vManage can ping eachother with no issues. However, when adding vManage 2 to form a cluster in cluster management using vpn 0 - eth2 addresses. vManage-2 is continuously in a pending state.

Can anyone please assist?

0 Replies 0

Review Cisco Networking for a $25 gift card