04-23-2003 02:49 PM
I know that 6500's have hot swappable parts, but can you pull a 48 port 10/100 blade and plug in a 16 port gig blade, with the router still on? what do i have to down the blade before I remove it? Does anyone have experience with doing this sort of operation and what sort of pitfalls should I look for?
Thanks in advance,
Justin
04-29-2003 11:58 AM
All modules of the Cat 6500 support hot swapping. If you perform a hot swap, the console displays the message "Module n has been inserted." However, if you can perform that operation during a maintenence downtime window, and are able to power off the switch, I would advise you to do so. You can hot swap them as well, but a cold swap is preferable.
05-05-2003 06:58 PM
You can hot swap between different module types.
I typically disable the module to be removed.
Do the physical swap.
Upon the new module being inserted and recognized.
enable module.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide