yes, now i have provisioned my project, and now i changes to the switch (Cli, Edge-Switch), as I simply have old corpses
in it (as you probably do too) which I can't simply switch off I was wondering and ask, is it also possible to
synchronise a config that has only been run on the EdgeSwitch local per CLI that are inside and running as EDGE-Switch
up to the Catalyst-Center? or would this then have to be done by fine-tuning in the Catalyst Center?
my second question would be - If I run a 2-stack and then extend it to a 3 or 4 stack, do I have to set up the whole
switch again and delete it completely from the DNA so that I can pull it in correctly? or is it possible to extend a stack
in the Catalyst-Center?