I have a SG30010-MPP
Is there a way to delay applying POE to a port until after the switch is fully booted?
I have a situation where I am using the switch with DCHP capabilities, but I need the switch and DHCP server to be fully booted before power is applied to the port. Since power is applied before the switch is fully booted, my devices configure with auto-IP and never see the DHCP server. is there a way to control the boot sequence to make sure the DCHP server if fully functional before power gets applied to the ports?
Solved! Go to Solution.
04-14-2015 10:47 AM
Hello,
There is no user-configurable way to delay the PSE (power source equipment) supplying power to the switchports when it detects working PEs (powered devices) connected to the switchports.
Thanks.
Yiu Kay Lee
Concentrix at Cisco
.:|:.:|:. CISCO | Yiu Kay Lee | SMB Pre-Sales | yiulee@cisco.com | Phone +1 (855) 354-7776
04-14-2015 10:47 AM
Hello,
There is no user-configurable way to delay the PSE (power source equipment) supplying power to the switchports when it detects working PEs (powered devices) connected to the switchports.
Thanks.
Yiu Kay Lee
Concentrix at Cisco
.:|:.:|:. CISCO | Yiu Kay Lee | SMB Pre-Sales | yiulee@cisco.com | Phone +1 (855) 354-7776
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide