cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
473
Views
0
Helpful
2
Replies

Catalyst Express 500 Setup while in production

averheaghe
Level 1
Level 1

I have 2 Cat Express 500 switches in production, without IP addresses configured (to the best of my knowledge) If I hit the setup button to initiate the config process will it impact the devices connected to the switch? Is this something I can do during use without kicking people out?

Thanks,

Andy

2 Replies 2

jpoplawski
Level 1
Level 1

Last I recall, it would affect connectivity. It would be best to perform this work during non-production hours to be safe.

Hope this helps, rate if it does!

JB

averheaghe
Level 1
Level 1

We went ahead and took care of it after hours.