I have 3 3750 staking swtich with the folowing configuracion:
H/W Current
Switch# Role Mac Address Priority Version State
----------------------------------------------------------
1 Member 442b.0350.9400 1 1 Ready
2 Member 442b.0357.8780 2 1 Ready
*3 Master 442b.036f.a800 3 1 Ready
The new switch is installed to be wired to the master switch. the swtich 3 (* 3 Master Ready 442b.036f.a800)
my question is: if you disconnect the wiring from the master stack to connect to the new switch, it is possible that the new switch change the current configuration of stacking.
-Can I just add the new switch with clean configuration without changing the current configuration ?
-how is assigned the stack number? i need the new switch be with the GI4 / x?. I can I manually by assigning ports?
-If I want to the new 3750 member witch lower prioridad, can I change priority before adding to stack?
Thanks in advance,
Solved! Go to Solution.
09-23-2012 03:28 PM
Hi Raul,
hope this will help as its same scenario as yours.
https://community.spiceworks.com/topic/251174-adding-a-new-switch-to-an-existing-stack
thanks
09-23-2012 03:19 PM
Hi,
Follow this link to add a new switch to your existing stack.
HTH
09-23-2012 03:28 PM
Hi Raul,
hope this will help as its same scenario as yours.
https://community.spiceworks.com/topic/251174-adding-a-new-switch-to-an-existing-stack