04-08-2021 05:08 PM - edited 04-08-2021 05:08 PM
Hell,
Ref. diagram attached.
Focusing on the ASA uplinks and downlinks to a pair of C9500 switches which are configured in a StackWise Virtual mode. The two physical ports on the ASA will be bundled into a L3 Port-Channel. From the ASA, each physical port will be connected to switch A and the other physical port will be connected to switch B in the stackwise domain. I was wondering if this design would work from the ASA stand-point. Meaning, can an ASA configured in a port-channel have one port connected to a switch and the other port connected to another switch considering that the switches are configured in a visualized mode (SV or VSS)?
Solved! Go to Solution.
04-08-2021 08:09 PM
Hi
If the 2 links of a PO goes into 2 switches built as StackWise Virtual or VSS, it will work without issue and it’s a supported design.
04-08-2021 08:09 PM
Hi
If the 2 links of a PO goes into 2 switches built as StackWise Virtual or VSS, it will work without issue and it’s a supported design.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide