cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
127
Views
0
Helpful
2
Replies

Switch synchronization delay

grapevine
Level 1
Level 1

We have a stack of IE 9320 switches as mentioned below:

1) IE-9320-26S2C

2) IE-9320-26S2C

3) IE-9320-24P4S

4) IE-9320-26S2C

All are in stack and in install mode and running IOS-XE 17.12.05

When we power cycle switch 3 and switch 4 in the stack, it is taking more time to come back up and synchronized. Is there a way to reduce the time.

2 Replies 2

Leo Laohoo
Hall of Fame
Hall of Fame

Please post the complete output to the command "sh switch details".

grapevine
Level 1
Level 1

#show switch detail

Switch/Stack Mac Address : 00 - Local Mac Address

Mac persistency wait time: Indefinite

H/W Current

Switch# Role Mac Address Priority Version State

-------------------------------------------------------------------------------------

*1 Active abc 15 V01 Ready

2 Standby abc 14 V02 Ready

3 Member abc 13 V01 Ready

4 Member abc 12 V02 Ready


Stack Port Status Neighbors

Switch# Port 1 Port 2 Port 1 Port 2

--------------------------------------------------------

1 OK OK 2 4

2 OK OK 1 3

3 OK OK 2 4

4 OK OK 3 1