Is there a way that you can configure a 4500X VSS stack to automatically failback to the primary switch after a secondary switch failure or upgrade. I upgraded the IOS on a 4500X VSS stack and reloaded the secondary switch first and then the primary. Thus my secondary switch is now the active one.
I know I can either just do a reload on the active switch or do a "redundancy force-switchover" command (which will reboot the active switch)
However:
1. Is there a way to set the configuration so that VSS falls back to my primary switch once it is back online (preferably without reloading the switch)
and
2. Is there a command to fallback to my primary switch without having to reload the active switch?
Jim