Hi everybody,
I started to detach sql database from a TMS server 13.1.1, with SQL studio express.
What' the exact procedure to detach the database with sql studio express or sql express and move it to an other server ?
I'm detach the base and i'm blocked, If I stop the operation and reboot the TMS, did I recover the database ??
Plz help !
Thanks,
Christopher.