We are migrating our Windows 2003 DC to 2012. We are using CUCM 8. I was wondering what needed to be done on the CUCM side of things during this migration. To me it seems like all there is to do is go to System>Ldap>ldap directory add the new servers IP address. Then after everything is done moving and the old DC is decomissioned, remove the old servers IP address. This seems way to simple and I'm sure I'm missing something. Also are there any changes that need to be made to the cisco unity connection?
Thanks,
Josh