Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
I have two Catalyst switches connected to each other with a cross over cable. All the ports in both the switches are defined in VLAN 1.We intentionally disconnect the two switches for 1 hour for a specific reason. When the cross over cable is reconne...
We are using CSS 11506 running 7.5 to load balance 2 web servers and SSL termination on CSS.The application does alot of redirects using Java withing HTML. The users are experiencing intermittant errors accessing the application. For example, the app...
I am using XP, IE 6 and JRE 1.4.1_02 to access Cisco Works Campus Manager application. When I start any of the CM functions, the PC hangs when trying to connect to ANI server.I have test CM application on server itself... it runs like a champ. But, f...
Suppose a location has 500 access level switches say 6509s. And, it is required to upgrade the code on these switches. What is the best way to do this task? with minimum effort and time.TIA Shahbaz
Suppose a location has 500 access level switches say 6509s. And, it is required to upgrade the code on these switches.What is the best way to do this task?TIA