Hello,We've recently migrated some of our ESX servers to a 3-port NIC team design. Everything seems from our end to work fine, however, we have had complaints that suddenly the VMs on those hosts are running "slow."On the ESX server side, we set up ...
Hey everybody,I just added a new switch to our stack in our server room. The stack had 5 members, and the 6th was a member from another stack in another server room.Here's what I did:Powered off the switch, removed it from the stackDeleted all confi...
Hi,I've been reading through the documentation for our Catalyst 3750s an I wasn't quite satisfied with the info I got. Here's the deal: We have two stacks of 3750s, one with 5 switches, the other with 2. Right now I want to move one switch from th...
Hi,I just brought my company's 6506 online and have been working to get it set up. I managed to install the latest .bin firmware s72033-ipbasek9-mz.122-33.SXI3.bin, but unlike our 2950s and 2960s at the edge, I cannot find any .tar format images wi...
Hello everyone,my company had a power outage over the weekend that apparently lasted longer than the UPS' could handle, and several of our switches lost power. No big deal, I back up the running configs every night at midnight, but now I'm unable to...
If I ran the commands:3750-Stack#diagnostic start switch 4 test 13750-Stack#diagnostic start switch 5 test 1to run the TestPortAsicStackPortLoopback test, what would happen? They're classified as non-disruptive tests, but the whole addition of a new ...
I still have this problem. I don't know why the link between 4 and 5 is down; I didn't even touch that link when adding the new switch. I'm afraid that if I attempt to remove or restart Switch 6 that Switch 5 will lose connectivity.Does anyone have...
Hoang,I have done the same thing that you are trying to do. I wanted to build a network simulation that included a WAN and centralized internet access.I have the following:Home router (with DD-WRT firmware installed instead of Linksys' factory stuff...
I was looking at this myself. I'm no expert, but it seems like the term "Switching bandwidth" refers to the amount of data that can be pumped through the switching plane, and that "Forwarding Bandwidth" actually refers to the amount of data that can...
I have this same problem. I recently added a 6th switch to a stack of 3750s and the link between the 4th and 5th switch went down: Switch # Port 1 Port 2 -------- ------ ------ 1 Ok Ok 2 Ok ...