Heads Up :
The post you are writing will appear in a public forum. Please ensure all content is appropriate for public consumption. Review the employee guidelines for the community here.
Dear Cisco Community,
Consider the SD-WAN Topology diagram attached here. I need to configure reachability end-to-end between the referred locations. Basically, in site-id 10, it has service VPN 10, and on the other side, on site 20, it has VPN 20. I...
Dear Cisco Community,
The DLTS control connections are up, but BFD sessions are down, with exeception of just 1 BFD session. Follow the outputs and topology in attachment.
Dear Cisco Community,
One of our customer has the following business need:Currently, the customer has one border router with three ISPs. As usual, each ISP delivers only one public IP address to that router. However, there is an emerging need to have...
Dear Community,
I am about to deploy SD-WAN controllers on Cisco Cloud. However, up to this point, we are unable to sign in into SSP.
Logging in Cisco Software Central, it was possible to see that there is an active Smart Account, as well as Virtual ...
Using vManage 20.9, it is falling to attach devices to a template.
There are some advices on internet to remove ciscotacro and ciscotacrw users from vManage CLI. It didn't work.
Error message from vManage GUI:
application error tag : access-denied
Solved... Thanks for your assistance!I just used same VPN service on both sites. Different Site-IDs but the same VPN service (VPN 1).
cEdge-ADM-1# show ip route | begin VPNVPN PREFIX PROTOCOL SUB TYPE IF NAME ADDR VPN TLOC IP COLOR ENCAP STATUS------...
Dear Community,
I double-checked the IP reachability end-to-end, and it is working pretty fine.
However, the problem still persists.
Basically, vBond is allowing just one DLTS control connection per vEdge. By the way, if I shutdown the interface int...
They are not restricted. take a look at the config.
cEdge-ADM-1# show run vpn 0vpn 0name Transportrouterospfrouter-id 10.10.10.1timers spf 200 1000 10000area 0interface ge0/2exitinterface ge0/3exitexit!!interface ge0/2description "Color MPLS"ip add...
Dear @MHM Cisco World,
Yeah... Indeed they are different, but they are also dependent.Before a BFD session can be built, a DTLS control connection should be stablished first.
In my scenario, just one BFD session is up. I would like to solve this. Can...