Please can someone help me, i have 2x 6513 switches with 2x ws-x6708-10ge blades in them with 1x X2-10GB-CX4 module in each blade and i'm using the 5m cx4 cables to connect between 6500's, At the moment i have tried powering up ad down blade, removin...