shiva.shivakumar
Level 1
Level 1
Member since ‎02-15-2010
‎08-18-2017

User Statistics

  • 4 Posts
  • 0 Solutions
  • 0 Helpful votes Given
  • 0 Helpful votes Received

User Activity

I have a situation to setup a network of workstations to communicate in Gb speed using the existing 62.5/125 MM fibre infrastructure between 3 buildings separated by a distance of 300m. I am thinking of using the Gb uplink ports in the Catalyst 2960 ...
I have an application where two C2960-24TC-L switches located 450m apart have to be connected via a 62.5 MM fibre link using the GLC-LH-SM transceiver modules. The fibre link is terminated to SC patch panels at both ends. The question is can off the ...
Community Statistics
Member Since ‎02-15-2010 04:12 PM
Date Last Visited ‎08-18-2017 03:53 AM
Posts 4