12-07-2020 03:09 AM - edited 07-05-2021 12:52 PM
Hello for everybody.
There is one site with core swicth 2960 and two wlc 3504 HA (see attach - 2 picture pdf). It is currently planned to replace the current core switch with a stack of two 9300 switches (see attach - 1 picture pdf).
Is it possible to connect each of the controllers to each of the switches with a separate link and select on the main wlc "enable lag on next reboot"? Or we need to disassemble this HA, then configure each of the controllers separately and reassemble HA again.
12-07-2020 08:51 AM
I believe LAG needs to be defined before you define SSO. So you would have to break SSO and setup each controller for LAG and reboot, then enable SSO.
12-07-2020 11:21 AM
Thank you for answer.
I'm strongly inclined to this point of view - disassemble current HA, configure each of the controllers separately - create etherchannel, and reassemble HA.
Unfortunately, there are no free controllers to test this solution in the lab...
12-07-2020 11:28 AM
Take a look at this thread: https://community.cisco.com/t5/wireless/support-for-lag-on-two-5520-s-in-ha/td-p/2872891
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide