12-16-2022 09:11 AM
Good morning,
I am doing my first deployment of Cisco ACI. Everything is currently in one data center. I have created POD1 and POD2. I connected the spines between pods directly to each other and everything discovered fine.
Now, I am working to simulate moving POD2 to my other data center, so I put a L2 switch between the pods. The PODS are no longer seeing each other. I enabled LLDP on the switch, and the spines see the switch but not each other.
Does anyone have any advice on this? Can I connect a multi pod fabric in 2 different data centers over a wave link or do I have to configure this with an IPN in the middle?
Thank you
12-16-2022 10:34 AM
Hi @mozorowsky
The Multi-Pod back-to-back can only be connected directly between them (usually a direct cable or dark fiber). Using a switch in the middle is not something supported, as far as I see in the documentation.
Take care,
Sergiu
12-16-2022 10:44 AM
BAH! Thank you! This is what I feared
Back to the drawing board to figure out how to convert to IPN
12-19-2022 06:36 AM
Hey Sergiu,
Just curious if you can point me down the right path. I will be converting this to an IPN. Is there any documentation you are aware of for this process? Should I plan to wipe my POD2 and rebuild as IPN or is there a wizard that will help me?
Regarding IPN do you know of a newbie/easy guide? I am looking and not really finding a good step by step to setup as IPN.
Thank you