03-08-2021 11:21 PM
Hi
I am trying to implement 3 layer hierarchy using DNA automation and PnP (zero-touch prov) only with OSPF as routing protocol
Q1: can that be done straight forward.
Q2: for distribution layer will be stacking of 2 C9500 switches and as i know i will need to interrupt PnP to make the stack configuration what will happen this way can? can DNA still detect 9500 stack SW and apply the template?
03-09-2021 02:07 AM
Q1: can that be done straightforward.
- OSPF as underlay protocol (instead of ISIS - it should be cisco support OSPF, but make sure do not summarise any routes - that is basic principle)
Q2: for distribution layer will be stacking of 2 C9500 switches and as i know i will need to interrupt PnP to make the stack configuration what will happen this way can? can DNA still detect 9500 stack SW and apply the template?
- C9500 - mostly StackWise Virtual (not traditional stacking) - is this Edge switch or Control Node?
For both the case you need reachability of the device to DNAC to get provisioned. ( PNP to get basic config for DNAC reachability) - then apply the DNAC template as per requirement.
03-09-2021 02:29 AM
hi balaji
its only a distribution Sw not SDA trying to make zero touch prov
still this can be done? or i have to make manual configuration?
03-09-2021 03:16 AM
use below document to help you :
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide