12-01-2024 01:57 AM
Dears,
when deploying DNAC servers in HA configuration for SD-Access deployment. Can we do so by having from each DNAC server (one) 10G enterprise link + (one) 10G Cluster link to the switches. or it is a (must) to have from each DNAC server (two) 10G enterprise link + (two) 10G Cluster link to the switches ?
Solved! Go to Solution.
12-01-2024 03:10 AM
It is not a strict requirement to have redundancy for both links, but it is recommended.
12-01-2024 02:25 AM
One interface.On the doc below, look at "cable connection"
12-01-2024 03:01 AM
it doesn't mention that we can operate with only (one) 10G enterprise link + (one) 10G Cluster link to the switches.
it only says:
Connect the primary instance of each node's Enterprise, Intracluster, Management, and Internet Port, as well as the Cisco IMC port, to the primary switch.
Connect the secondary instance of each node's Enterprise, Intracluster, Management, and Internet Port to the secondary switch.
So, my question can we operate with only
12-01-2024 03:10 AM
It is not a strict requirement to have redundancy for both links, but it is recommended.
12-01-2024 03:38 AM - edited 12-01-2024 03:44 AM
"(Required) 10-Gbps Enterprise Port (Network Adapter 1): The purpose of this port is to enable Cisco DNA Center to communicate with and manage your network. Connect this port to a switch with connections to the enterprise network and configure one IP address with a subnet mask for the port. "
Where did you read " connect multiples interfaces " on the document?
Network adapter "1" means what?
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide