04-07-2011 09:33 PM - edited 03-14-2019 07:43 AM
Does anybody know the proper procedure for adding a new UCCX node? The first node currently has a SR installed.
Do I remove the SR from the first node then install the second node?
Or can I apply the SR to the second node before adding it to the cluster?
Thanks
04-07-2011 10:06 PM
It would help to know the version of UCCX you are using.
04-07-2011 10:31 PM
Running 7.0(1)SR05_Build504
04-07-2011 10:45 PM
Well this procedure worked:
First Node running 7.0(1)SR05_Build504
Installed 7.0(1) on Second Node
Installed SQL
rebooted
Installed SR5
rebooted
Ran CCX Setup
Worked like a champ!
Hope this helps someone.
04-08-2011 08:58 AM
If you've never done it before, try running it in a lab enviornment before you do it in production. The Telephony OS will install in VMWare for 30 days which should give you time to test and run through the upgrade process in a sandbox before you touch your production equipment.
The procedure I use is the following:
On existing UCCX 7.0(1)SR5 box:
On new UCCX HA server
A couple of other things to note:
-Steven
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide