05-06-2022 01:52 AM
Hallo,
i have a custumer who would like to migrate his Switche to Cisco MDS 9148.
We bought 4 Switche and i wanna configure 2 Fabric :
Data Center 1 has SW1 connectet to SW 2 in Data Center 2 with 2 Cables
Data Center 1 has SW3 connected to SW 4 in Data Center 2 with 2 Cables
Server and Storage in Data Center 1 are connected redundant to Cisco Fabric 1&2
Server and Storage in Data Center 2 are connected redundant to Cisco Fabric 1&2
How i can configure the 2 MDS Switches 9148 in one Fabric?? -> Should i use VPC Technology ???
which recommendations can give me pls to complete this configuration??
Thanks in Advance
Jalo
05-06-2022 09:36 AM
05-08-2022 11:45 PM
Thanks for Reoly ...
what do you mean with distance!
which diffrence of configuration makes the distance?
05-09-2022 02:43 PM
05-10-2022 12:27 AM
Thanks for your Reply:)
About Port Channel Configuration, when i configure Port Channel for 2 of Switche MDS 91248, they will be as Active, Active or Active, Standby, or they will be as a one logical Switch like VPC with Nexus Switche?!