cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
2694
Views
0
Helpful
3
Replies

Prime Infrastructure 3.2 -> 3.4 upgrade times

patoberli
VIP Alumni
VIP Alumni

Hi all

I just wonder, what are your typical upgrade times when upgrading the vm version of PI 3.2 to 3.3 or 3.4?

I'm now waiting since ~16 hours at the step "Stage 7 of 7 Re-enabling database settings". I can see that two cpu cores are fully loaded in vSphere, so I assume it's still migrating data.

I'm having 2 WLC and around 180 APs which are managed by PI, plus around 2000 users.

3 Replies 3

What was the eventual outcome?  I'm at stage 7 of 7 after 22 hours.  The database is fairly large.  The backup file is 23 GB.  

Hi,

 

Was your upgrade successful finally. I am also in same situation and just waiting to get this completed for more then 2 hours now.

I don't anymore fully remember, but I don't think it was successful. I think I made a fresh installation and then restored the full backup from the old version.