01-16-2023 05:17 AM
Hello
I have a FPR 4112 connected to switch layer 3 cisco .
so my problem about this port :
Ethernet1/1 Mgmt Enabled Link Down All Link failure or not-connected
and port in switch layer 3 is UP but neigbhor Ethernet1/1 Mgmt in FPR4112 is down !!!??
also i have a module : GLC-TE CISCO in Ethernet1/1 Mgmt
ftd1-4112 /eth-uplink/fabric # show interface
Interface:
Port Name Port Type Admin State Oper State Allowed Vlan State Reason
--------------- ------------------ ----------- ---------------- ------------ ------------
Ethernet1/1 Mgmt Enabled Link Down All Link failure or not-connected
Ethernet1/2 Data Enabled Link Down All Link failure or not-connected
Ethernet1/3 Data Enabled Link Down All Link failure or not-connected
Ethernet1/4 Data Enabled Link Down All Link failure or not-connected
Ethernet1/5 Data Enabled Link Down All Link failure or not-connected
Ethernet1/6 Data Enabled Link Down All Link failure or not-connected
Ethernet1/7 Data Enabled Sfp Not Present All Unknown
Ethernet1/8 Data Enabled Sfp Not Present All Unknown
I don't know how i can activate port : Ethernet1/1 Mgmt in FPR 4112 cisco !!
I wait a reply and answer from expert security cisco
Thanks
Solved! Go to Solution.
01-16-2023 05:24 AM
how is your switch side config : (post below output )
show run interface gig x/x
show interface gi x/x
check quick start guide of Firepower chasis manager :
01-16-2023 06:52 AM
GigabitEthernet1/0/9 is up, line protocol is up (connected)
this show connected, as oer your screenshot your mgmt port connected to this port.
you also need to connect other physical ports to switch (use as port-channel or different way what you looking to do)
and same time if you configuring FTD those resources need to be used part of your installation FTD instance.
check this video bootstraping FTD 41XX#
01-16-2023 09:31 AM
Glad all good and thank you for your feedback.
01-16-2023 05:24 AM
how is your switch side config : (post below output )
show run interface gig x/x
show interface gi x/x
check quick start guide of Firepower chasis manager :
01-16-2023 05:34 AM
about ouput switch layer 3
SW_EDGEBackUp-2#show running-config interface GigabitEthernet1/0/9
Building configuration...
Current configuration : 118 bytes
!
interface GigabitEthernet1/0/9
description "to-ftd2-4112"
switchport access vlan 254
switchport mode access
end
/////////////////////////////////////////
SW_EDGEBackUp-2#show interfaces gigabitEthernet 1/0/9
GigabitEthernet1/0/9 is up, line protocol is up (connected)
Hardware is Gigabit Ethernet, address is 9c57.ad55.9389 (bia 9c57.ad55.9389)
Description: "to-ftd2-4112"
MTU 1500 bytes, BW 1000000 Kbit/sec, DLY 10 usec,
reliability 255/255, txload 1/255, rxload 1/255
Encapsulation ARPA, loopback not set
Keepalive set (10 sec)
Full-duplex, 1000Mb/s, media type is 10/100/1000BaseTX
input flow-control is off, output flow-control is unsupported
ARP type: ARPA, ARP Timeout 04:00:00
Last input never, output 00:00:01, output hang never
Last clearing of "show interface" counters never
Input queue: 0/2000/0/0 (size/max/drops/flushes); Total output drops: 0
Queueing strategy: fifo
Output queue: 0/40 (size/max)
5 minute input rate 0 bits/sec, 0 packets/sec
5 minute output rate 0 bits/sec, 0 packets/sec
3 packets input, 282 bytes, 0 no buffer
Received 3 broadcasts (3 multicasts)
0 runts, 0 giants, 0 throttles
0 input errors, 0 CRC, 0 frame, 0 overrun, 0 ignored
0 watchdog, 3 multicast, 0 pause input
0 input packets with dribble condition detected
5291 packets output, 516434 bytes, 0 underruns
0 output errors, 0 collisions, 2 interface resets
0 unknown protocol drops
0 babbles, 0 late collision, 0 deferred
0 lost carrier, 0 no carrier, 0 pause output
0 output buffer failures, 0 output buffers swapped out
SW_EDGEBackUp-2#
Also you will have a screenshot about FMC 4112
Please i wait a reply and a help
thanks
01-16-2023 05:45 AM
@Dhikra Marghli have you also enabled the interface via the FMC in addition to FXOS?
01-16-2023 05:53 AM
Switch layer 3 can ping FMC
and i want to add FPR 4112 to FMC but i can't because port is down !!
01-16-2023 06:52 AM
GigabitEthernet1/0/9 is up, line protocol is up (connected)
this show connected, as oer your screenshot your mgmt port connected to this port.
you also need to connect other physical ports to switch (use as port-channel or different way what you looking to do)
and same time if you configuring FTD those resources need to be used part of your installation FTD instance.
check this video bootstraping FTD 41XX#
01-16-2023 09:28 AM
thanks to reply ..
i try to edit port FTD from 10 G to 1g ...so il will be Up
Thanks for your help
01-16-2023 09:31 AM
Glad all good and thank you for your feedback.
Discover and save your favorite ideas. Come back to expert answers, step-by-step guides, recent topics, and more.
New here? Get started with these tips. How to use Community New member guide