cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
1057
Views
10
Helpful
7
Replies

Ethernet1/1 Mgmt Enabled Link Down All Link failure or not-connected

Dhikra Marghli
Level 5
Level 5

Hello

I have a FPR 4112  connected to switch layer 3 cisco .

so my problem about this  port :  

Ethernet1/1 Mgmt Enabled Link Down All   Link failure or not-connected

and  port in switch layer 3 is UP but neigbhor Ethernet1/1 Mgmt in FPR4112 is down !!!?? 

also i  have  a module : GLC-TE CISCO iEthernet1/1 Mgmt 

ftd1-4112 /eth-uplink/fabric # show interface

Interface:
Port Name Port Type Admin State Oper State Allowed Vlan State Reason
--------------- ------------------ ----------- ---------------- ------------ ------------
Ethernet1/1 Mgmt Enabled Link Down All Link failure or not-connected
Ethernet1/2 Data Enabled Link Down All Link failure or not-connected
Ethernet1/3 Data Enabled Link Down All Link failure or not-connected
Ethernet1/4 Data Enabled Link Down All Link failure or not-connected
Ethernet1/5 Data Enabled Link Down All Link failure or not-connected
Ethernet1/6 Data Enabled Link Down All Link failure or not-connected
Ethernet1/7 Data Enabled Sfp Not Present All Unknown
Ethernet1/8 Data Enabled Sfp Not Present All Unknown

I don't  know how i can activate port  :    Ethernet1/1 Mgmt in FPR 4112  cisco !!

I wait a reply  and answer from  expert  security  cisco

Thanks

 

3 Accepted Solutions

Accepted Solutions

balaji.bandi
Hall of Fame
Hall of Fame

how is your switch side config : (post below output )

show run interface gig x/x

show interface gi x/x

check quick start guide of Firepower chasis manager :

https://www.cisco.com/c/en/us/td/docs/security/firepower/quick_start/fp4100/firepower-4100-gsg/chassis_setup.html#concept_twm_t2x_xgb

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

View solution in original post

GigabitEthernet1/0/9 is up, line protocol is up (connected)

this show connected, as oer your screenshot your mgmt port connected to this port.

you also need to connect other physical ports to switch (use as port-channel or different way what you looking to do)

and same time if you configuring FTD those resources need to be used part of your installation FTD instance.

check this video bootstraping FTD 41XX#

https://www.youtube.com/watch?v=p1Ox8GGu9Pg

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

View solution in original post

Glad all good and thank you for your feedback.

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

View solution in original post

7 Replies 7

balaji.bandi
Hall of Fame
Hall of Fame

how is your switch side config : (post below output )

show run interface gig x/x

show interface gi x/x

check quick start guide of Firepower chasis manager :

https://www.cisco.com/c/en/us/td/docs/security/firepower/quick_start/fp4100/firepower-4100-gsg/chassis_setup.html#concept_twm_t2x_xgb

 

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

about  ouput  switch  layer 3

 

SW_EDGEBackUp-2#show running-config interface GigabitEthernet1/0/9
Building configuration...

Current configuration : 118 bytes
!
interface GigabitEthernet1/0/9
description "to-ftd2-4112"
switchport access vlan 254
switchport mode access
end
/////////////////////////////////////////

SW_EDGEBackUp-2#show interfaces gigabitEthernet 1/0/9
GigabitEthernet1/0/9 is up, line protocol is up (connected)
Hardware is Gigabit Ethernet, address is 9c57.ad55.9389 (bia 9c57.ad55.9389)
Description: "to-ftd2-4112"
MTU 1500 bytes, BW 1000000 Kbit/sec, DLY 10 usec,
reliability 255/255, txload 1/255, rxload 1/255
Encapsulation ARPA, loopback not set
Keepalive set (10 sec)
Full-duplex, 1000Mb/s, media type is 10/100/1000BaseTX
input flow-control is off, output flow-control is unsupported
ARP type: ARPA, ARP Timeout 04:00:00
Last input never, output 00:00:01, output hang never
Last clearing of "show interface" counters never
Input queue: 0/2000/0/0 (size/max/drops/flushes); Total output drops: 0
Queueing strategy: fifo
Output queue: 0/40 (size/max)
5 minute input rate 0 bits/sec, 0 packets/sec
5 minute output rate 0 bits/sec, 0 packets/sec
3 packets input, 282 bytes, 0 no buffer
Received 3 broadcasts (3 multicasts)
0 runts, 0 giants, 0 throttles
0 input errors, 0 CRC, 0 frame, 0 overrun, 0 ignored
0 watchdog, 3 multicast, 0 pause input
0 input packets with dribble condition detected
5291 packets output, 516434 bytes, 0 underruns
0 output errors, 0 collisions, 2 interface resets
0 unknown protocol drops
0 babbles, 0 late collision, 0 deferred
0 lost carrier, 0 no carrier, 0 pause output
0 output buffer failures, 0 output buffers swapped out
SW_EDGEBackUp-2#

 

 

Also  you will have a screenshot  about  FMC 4112

 

Please i wait a reply and a help

thanks

 

@Dhikra Marghli have you also enabled the interface via the FMC in addition to FXOS?

Switch layer 3 can ping FMC 

 

and i want to add FPR 4112 to FMC but i can't because port is down !!

GigabitEthernet1/0/9 is up, line protocol is up (connected)

this show connected, as oer your screenshot your mgmt port connected to this port.

you also need to connect other physical ports to switch (use as port-channel or different way what you looking to do)

and same time if you configuring FTD those resources need to be used part of your installation FTD instance.

check this video bootstraping FTD 41XX#

https://www.youtube.com/watch?v=p1Ox8GGu9Pg

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

thanks to reply ..

i try to edit port FTD from 10 G to 1g ...so il will be Up 

Thanks for your help

Glad all good and thank you for your feedback.

BB

***** Rate All Helpful Responses *****

How to Ask The Cisco Community for Help

Review Cisco Networking for a $25 gift card