I'm using 2 PVCs approach for VoIPoATM. For the voice bearer traffic, it is on VBR-RT (real time). for signalling. nothing else will pass through it. For signalling and other data, its on uBR. vBR-rt is deployed along the whole path including gateway and switches.
I believe I don't need LLQ because vBR-rt always prioritize the voice traffic over the data on the egress port of the gateway and within the switch as well. pls confirm my thinking is correct or not.
I want to keep the config simple, clear and logical.
Thanks.
Yuenme