N5K vlan_mgr hap reset on creating or deleting VLAN CSCup82624

sandhub
Level 1
Level 1

Hi,

   Our 5596's are running on code version 5.2(1)N1(7) and i have just seen the bug CSCup82624. During a maintenance window we had to delete and re-add 800 vlans to our secondary nexus 5k.

   This was because we needed to put the vlans that were already in the database into spanning-tree.

When we tried this previously on a handful of vlans the vpc's went into a type 2 inconsistency state and became suspended.

The workaround we applied - 

Primary 5k

put into spanning-tree on the primary 5k - spanning-tree vlan 2,7-9,8...... priority 16384

                                                                   spanning-tree vlan 2,7-9,8......

----

Secondary 5k

put into spanning-tree on the secondary 5k - spanning-tree vlan 2,7-9,8...... priority 32768

                                                                       spanning-tree vlan 2,7-9,8......

at this point vlans will be suspended with a type 2 consistency check

 

Only by deleting and re-adding on the seconday 5k did we manage to bring the vlans into spanning-tree. Doing over 800 vlans - it took along time.

The secondary switch reloaded 3 times during the change.

Now looking at the bug - CSCup82624 - it appears there is no fix in any nx-os release for this which is worrying.

 

Thanks

Baljit

1 Reply 1

noc0000048
Level 1
Level 1

I have met this bug on 7.3(0)N1 (5596UP).

 

5000-line became to EOS-stage and will be no bugfixes?