cancel
Showing results for 
Search instead for 
Did you mean: 
cancel
460
Views
0
Helpful
1
Replies

configure E1 PRI DDR for bandwidth on demand

ctabeling
Level 1
Level 1

I like to configure a E1 PRI between 2 routers so that the B-channels are only dialed when needed. So start with the B channel 1, when die Bandwith goes over 64K dial the second one and so on (like ppp multilink with dialer-load-threshold for BRI).

Is this possible?

Thanks,

Christof

1 Reply 1

tepatel
Cisco Employee
Cisco Employee

Those two commands that you have described will do the job on E1-PRI lines too. They are not just for BRIs.

So design the dialer load threshold the way you need and here is the url for more in that area,

http://www.cisco.com/warp/public/131/mppp-ddr.html

OR

You can use BACP (Bandwidth Allocation Control Protocol ) for that too. Here is the url for that.

http://www.cisco.com/univercd/cc/td/doc/product/software/ios113ed/113ed_cr/dial_c/dcprt8/dcbacp.htm

Review Cisco Networking for a $25 gift card